| 2022 STC Installation Award - Multi-field |
2022 STC Installation Award - Multi-field
FAWKNER SCHOOL VIC - PREMIER SYNTHETIC GRASS
The school awarded the project after a thorough tendering process to surface 4 different areas at the school in 2 different stages. First stage was to construct/surface a soccer field and running track, and the second area as a basketball court/running track/multisport area. On stage 2 the third area was to be converted into a volleyball and dodge ball area, and the last area was converted as a 4 square court area. This project consisted of drainage assessments, removal of existing surface and disposing with skip bins, laser grading the top layer of the crushed dust layer and rolling/compacting, rectification works of the asphalt surface and laying of the synthetic grass in accordance with the plans. Champion grass had to ensure the project was completed on time due to some delays caused by the worldwide logistic issues. Champion grass used 2 - 3 teams in different shifts to ensure the project was completed on time prior to the end of the school holidays.
|
12/11/2025
STC Quarterly Member Meetup - Q4 2025
4/14/2026 » 4/16/2026
ESTC Congress 2026
10/26/2026 » 10/28/2026
2026 STC Annual Conference